Project Name Location Yr. Value Brief of project
|
|
1.Haraz Residential Project Hadramout 222,700,000 Construction of 50 residential
Thamood Dist. Units of Two rooms +lounge +
Toilet+staircase+small backyard
|
|
2.Manahel Residential Prjct. Hadramout 106,700,000 Const.of 20 residential units of
Wadi Abbud Two Rooms+lounge+toilet +stair
Case +small backyard.
|
|
3.New Sawad Sa'wan Prjct. Sect.of the Capital 1,143,600,000 (A) 3 Rm.+Kitchen+Toilet
(B) 2Rm.+Kitchen+Toilet and
Stair case well complete with all
Basic facilities and infrastructure.
|
|
4.15 units project at Dhe Kufi Al Mahra 25,500,000 2 room+lounge+Toilet+backyard
Shahn dist.
|
|
5.Sawad Sa'wan M-1/2 Prjt. Sect.of the Capital 87,576,979 Providing 1580 pieces of lands
Asphalting 6.5 Km. of township
Road network, 1532 M.sewage
Network , (12 ) Km. potable
Water supply lines, construct 126
Nos. buildings of various types
Designs of which 36 buildings are
Of Two story type and the rest are
Single story.
|
|
6.Unification Residential Sect.of the Capital 1,744,029,000
Project.( Three Groups) Total number of units Constructed
are 278, which are :-
Type (A) = 10 Units , Type (B)= 40
Units (Two Story), Type (C) = 50
Units single story with staircases ,
Type (D)=56 units single story , and
33 Buildings accommodating (132)
Flats with all basic services, like
Sewerage, water supply, electricity,
Internal (asphalted) roads and paved
Foot paths.
|
|
7.July7 Project. Aden 186,781,356 Construct 3811 M. sewerage system . net work & collection plant, grid line
Electricity connection to the zone.
|
|
8.July 7 Project Al Hodeidah 1,008,000,000 The project comprises of 2800 pcs.
of lands, distributed among the limi
ted and immigrant returnees due to
aftermath of the Gulf war; inclusive
of basic services like sewerage , Elec
tricity supply and asphalted road net work
|
|
9.Flood Protection project Taiz 342,831,730 The project comprises of constructing
Taiz – Phase – I dams and dykes to prevent debris and
Stones from being dragged along with
floods, construct lined canals to absorb
and divert flood waters, construct
reinforced concrete culverts and
asphalted roads :-
Total open canal – 3250 MR.
RCC culverts – 2038 MR.
Asphalted roads – 4239 MR.
|
|
10.Taiz Municipal Devp.and Taiz 9,300,000,000 Protect Taiz city against flood damages
Flood protection Ph.II and construct 244 housing units for
Displaced people as a result of
Implementing the project.
|
|
Total Value 14,194,719,074
|
|